01 HOMEOWNER GUIDE

Do you need permission to remove a chimney?

Removing a chimney breast always needs Building Regulations approval because it is structural. Taking down a stack often counts as permitted development, so no planning application, but conservation areas, Article 4 directions and listed buildings change that. A chimney on a shared wall needs a party wall notice to the neighbour, served before work starts.

Quotes from photosBuilding Control sign-offRubble taken away
Building Regulations
Always for breast removal; often needed when a stack comes down
Planning permission
Not usually for a breast; a stack may be permitted development
Listed building
Listed building consent needed, inside or out
Party wall notice
At least two months before work on a shared wall
Engineer
Normally needed whenever masonry is left above
Scaffold on the pavement
Highway licence from the highway authority

Which permissions apply to which chimney job

What you need depends on which part comes out and whether it is shared. Your council or Building Control body makes the final call on any house.

Permissions that normally apply, by type of chimney job
JobPlanning permissionBuilding RegulationsParty wall noticeStructural engineer
Stack only, above the roofOften permitted development; check if conservation area, Article 4 or listedNot always for the part above the roof; check with Building ControlIf the stack sits on or serves a party wallNot usually
Breast only, stack keptNo, unless the building is listedYes, alwaysYes, if the breast is on a party wallYes, to design the support
Full chimney, stack and breastsAs for stack removalYesIf on a party wallSometimes, to check nothing else bears on it
Shared stack on a terrace or semiAs for stack removalYes, in most casesYesUsually

A summary of what normally applies, not a decision on your property. Listed buildings need listed building consent for any of these.

Planning permission and permitted development for chimneys

Removing an internal chimney breast does not need planning permission because it does not change the outside of the house. Removing a chimney stack may fall under permitted development rights, so no planning application is needed, provided the house is not in an area where those rights have been removed or restricted.

For certainty, you can apply for a lawful development certificate. Once granted, no enforcement action can be taken against the work it covers.

Listed buildings

If the house is listed, you need listed building consent before altering the chimney. That applies to internal breasts and fireplaces as well as stacks, because the listing protects the whole building. Consent is separate from planning permission and from Building Regulations.

Conservation areas and Article 4 directions

Councils can remove the right to take down stacks without permission using an Article 4 direction. In Brighton & Hove, the directions for the North Laine, Round Hill and Ovingdean conservation areas each bring the alteration or removal of chimney stacks on houses under planning control, and other areas have their own directions. Check the direction for your street before booking any stack work.

The South Downs National Park

Lewes town and parts of Lewes district lie inside the South Downs National Park, where the National Park Authority, not the district council, is the planning authority. Most of Peacehaven, Newhaven and Seaford lies outside the park boundary, but check the map for your address.

Building Regulations for chimney removal

Building Regulations approval always applies when a chimney breast is removed, because it is a structural alteration covered by Part A (Structure). The Building Control surveyor checks that whatever is left above is properly supported, that fire protection is in place, and that the flue left behind is capped and ventilated.

Removing only the part of a stack above the roof may not need approval, according to the Planning Portal. Many councils still expect an application where any part of the stack is taken down, because it can affect the structure below and a neighbour's flue. Ask your Building Control body before assuming it is exempt.

How to apply

  • Building notice. Suited to smaller internal work like a breast removal. In Brighton & Hove you can start two working days after submitting it. There is no formal plan approval in advance, so the engineer's calculations are checked as the work goes.
  • Full plans. Drawings and calculations are approved before work starts. Slower, but more certain.
  • Registered building control approver. A private, government-registered alternative to the council. It can handle the work from the start but cannot regularise work already done.

Completion certificates and selling

When the final inspection passes, Building Control issues a completion certificate. Keep it with the deeds: a buyer's solicitor will ask for it, and without it a sale can stall.

If the chimney was removed without approval

If you or a previous owner removed a breast without Building Control approval, the council can consider a regularisation application for the work. Only the local authority can regularise; private approvers cannot. Expect to open up ceilings or boxing so the support can be inspected, and to change it if it does not comply. In Brighton & Hove the regularisation fee for a chimney breast is £334.25, from the council's fee table. Lewes District Council publishes its own regularisation form and fees.

Party wall notices for chimney removal

If the breast or stack is on a party wall, the Party Wall etc. Act 1996 applies. The Act specifically gives the right to cut away a projecting chimney breast from a party wall, but you must serve a party structure notice on the adjoining owner at least two months before work starts.

  • The neighbour should reply in writing within 14 days. They can consent, or dissent.
  • If they do not reply within 14 days, a dispute is treated as having arisen.
  • A dispute is settled by surveyors: one agreed surveyor, or one each with a third if they disagree. The surveyors draw up an award setting out how the work is done.
  • The building owner normally pays the surveyors' fees, including the neighbour's surveyor, where the work is only for their benefit.
  • Work can start sooner than two months if the neighbour agrees in writing. A notice lapses if work has not started within a year.

Engineers, gas appliances and scaffold licences

When you need a structural engineer

You need an engineer whenever masonry stays above the part you remove. Building Control will want a beam sized by calculation unless the span is very short, and councils that still accept gallows brackets now ask for calculations and fixing tests too. A full removal with nothing left above may need no engineer, unless floor joists or a roof timber bear on the chimney.

Gas fires and Gas Safe

Any gas fire or appliance connected to the chimney must be disconnected and the supply capped by a Gas Safe registered engineer before the breast is touched. It is a legal requirement that anyone working on gas fittings in a home is on the Gas Safe Register.

Scaffold and pavement licences

Scaffolding on a public pavement or road needs a licence from the highway authority under the Highways Act 1980. Your scaffolder normally applies. A skip on the road needs a licence too.

Who handles chimney permissions in Brighton & Hove and East Sussex

Planning and Building Control are run by the district or city council, except inside the South Downs National Park, where the National Park Authority handles planning. Scaffold licences come from the highway authority, which is a different council in each area.

Local authorities for chimney removal permissions
AreaPlanningBuilding Control (council)Scaffold licences
Brighton & HoveBrighton & Hove City CouncilBrighton & Hove City CouncilBrighton & Hove City Council
Lewes town and the National ParkSouth Downs National Park AuthorityLewes District CouncilEast Sussex County Council (East Sussex Highways)
Peacehaven, Newhaven, SeafordLewes District Council (outside the National Park)Lewes District CouncilEast Sussex County Council (East Sussex Highways)

Any area may also use a private registered building control approver instead of the council.

Council pages: Brighton & Hove building regulations and highway licences; Lewes building control; South Downs planning; East Sussex Highways licences.

For the work itself, see chimney breast removal and chimney stack removal; for fees in a budget, the cost guide.

Sources and further reading

02 QUESTIONS

Common questions

Want a figure for your own house?

Get my free quote
Can I be made to put a chimney stack back?

Yes, if planning permission or listed building consent was needed and not obtained. The council can take enforcement action requiring the stack to be reinstated, which is a real risk in Brighton & Hove conservation areas with Article 4 directions. Checking first, or getting a lawful development certificate, avoids that.

Does my neighbour have to agree before I remove my chimney breast?

They do not have to agree for the work to happen, but they must be served notice if the breast is on a party wall. If they dissent or do not reply, surveyors settle how the work is done through an award. They cannot simply veto work the Act allows.

How long does Building Control approval take?

With a building notice in Brighton & Hove you can start two working days after submitting. A full plans application takes longer because the drawings are checked first. Either way, the party wall notice period of at least two months is often the longer wait on a terrace, so serve it early.

Who is responsible for getting the approvals, me or the builder?

Legally, the homeowner is responsible for making sure work complies, even if a builder handles the paperwork. Agree in writing who submits the Building Control application, who serves party wall notices and who books the scaffold licence, and ask for copies of each.