- Postcodes
- BN1, BN2, BN3, BN41
- Planning authority
- Brighton & Hove City Council (check your address if you live on the edge of the Downs, inside the South Downs National Park)
- Building Control
- Brighton & Hove City Council Building Control, or a registered building control approver
- Scaffold licence
- Brighton & Hove City Council highway licensing (it is the highway authority)
- Typical housing
- Regency stucco terraces, Victorian terraces, interwar semis, bungalows
- Conservation areas
- 34 listed on the council's conservation areas page, several with Article 4 directions that cover chimneys
Houses and chimneys in Brighton & Hove
Brighton & Hove has four broad generations of chimney: tall rendered stacks on Regency stucco, shared brick ridge stacks on Victorian terraces, lower side or hip stacks on interwar semis, and short stacks on bungalows. Which one you have decides the scaffold, the permissions and most of the price.
Kemptown, Brunswick and central Brighton
The seafront squares and crescents are early nineteenth century speculative building: the Kemp Town estate was started in 1823 and finished in 1855. These houses run to four or five storeys, with stacks rendered and painted to match the stucco and a flue for nearly every floor. Behind the stucco, many walls are bungaroosh, not brick.
Hanover, Elm Grove, Round Hill, Preston Park and Poets Corner
These are dense Victorian terraces built close together on steep ground; Hanover climbs a very steep hill east of The Level. The typical stack straddles the party wall at the ridge with a row of pots, half yours and half next door's. The council's Round Hill appraisal records original Welsh slate roofs, many since re-covered in concrete tiles.
Hove Park, Patcham, Withdean and Hangleton
Further north the housing is mostly interwar and later; many of the estates around old Patcham village date from the 1930s. Stacks are lower and lighter, often on a side wall or hip under clay or concrete tiles, and simpler to take down.
Saltdean, Woodingdean, Ovingdean, Rottingdean and Portslade
Saltdean was farmland until housing plots were sold from 1924. Bungalows here and in Woodingdean give the cheapest removals in the city because the scaffold is low. Rottingdean, Ovingdean and Portslade Old Village are older flint village cores, each a conservation area.
Why Brighton & Hove homeowners remove chimney stacks
The usual reasons are an unused stack letting water in, a cracked or leaning stack, and a breast taking space a small terraced room cannot spare. On the seafront and the open hills, wind-driven rain and salt air wear render, pointing and lead flashing, so a leak is often what starts it.
- Small rooms: in a Hanover or Poets Corner front room, removing the breast is the cheapest way to gain width.
- Lofts and solar: a breast in a terrace loft blocks dormers and stairs; a stack on the south slope shades panels.
- Shared houses: landlords of student lets, including in Hanover, rarely want to maintain a stack nobody uses.
- Surveys: a mortgage survey flagging a leaning stack or failed render often needs an answer before a sale.
If only the flashing or top courses have failed, a repair may be cheaper.
Chimney stack removal in Brighton & Hove
Taking a stack down here means a scaffold on a steep or narrow street, a council licence for any scaffold on the pavement, and a roof patched to match. On terraces it also means dealing with next door's half of the stack.
- Steep streets: on Hanover, Elm Grove and Round Hill the scaffold must be levelled on a sloping pavement, which takes more fittings and time.
- No rear access: most mid-terraces have no back lane, so rubble comes down a chute at the front. Only specialist scaffold companies can take out the council's highway licence.
- Parking bays: in a controlled parking zone, the council will not issue the licence until a parking bay suspension is in place.
- Matching the roof: Welsh slate needs reclaimed or new slate to blend in; concrete tiles are easier to patch.
- Shared stacks: either agree with next door to take the whole stack down, or remove your half and leave their side sound. The Party Wall etc. Act 1996 normally applies.
Chimney breast removal in Brighton & Hove
Removing a chimney breast in Brighton & Hove needs a structural engineer's design and Building Control approval. What is left above must be supported, and in Regency houses the wall may be bungaroosh, which behaves differently from brick.
What bungaroosh is and why it matters
Bungaroosh is a Brighton walling mix of flint, broken brick, shingle and lime mortar poured between timber shuttering. The Regency Town House says the shells of Brighton's speculative Regency houses were commonly built of it, and it is most common in the seafront squares, crescents and Kemp Town. It resists water poorly and can crumble when dry.
Without regular courses, a bungaroosh party wall is less predictable to cut than brick, and the supports for the stack above must bear on sound material. An engineer should see the wall opened up before designing support.
Victorian terraces
In Hanover, Round Hill and Preston Park the breasts usually sit back to back with next door's on a brick party wall. Removing the ground floor breast while keeping the stack needs steel or approved brackets, and normally a party wall notice. See chimney breast removal.
Permissions for chimney removal in Brighton & Hove
Outside conservation areas, removing a stack on a house is normally permitted development, though Building Control approval is needed. Where an Article 4 direction covers chimneys, you need planning permission, and on a listed building you need listed building consent even for internal work.
The council's conservation areas page lists 34 areas, including Kemp Town, Brunswick Town, Regency Square, North Laine, Round Hill, West Hill, Queen's Park, Hangleton, Patcham, Rottingdean and Portslade Old Village. Several Article 4 directions name chimneys:
- North Laine: permission is needed for the erection, alteration or removal of a chimney on single family houses.
- West Hill: chimney stacks on street-facing frontages cannot be altered without permission.
- Round Hill: the council's appraisal says demolition or alteration of chimneys needs permission.
- Brunswick (comprehensive direction): removal of chimney stacks or pots requires consent and will not usually be granted.
Check others, such as Kemp Town and Queen's Park, individually. For Building Regulations the council offers a Building Notice or Full Plans (choosing an application); scaffolds and skips go through highway licensing. Full detail is in our regulations guide.
Chimney stack removal cost in Brighton & Hove
Brighton & Hove prices usually sit in the upper half of these ranges. Five-storey Regency houses, shared terrace stacks, steep-street scaffolds, bungaroosh walls and slate matching all push costs up; a Saltdean bungalow sits at the low end.
| Job | Guide range |
|---|---|
| Stack removal, bungalow, scaffold included | £1,200 – £2,000 |
| Stack removal, two-storey terrace or semi, scaffold included | £1,800 – £3,500 |
| Stack removal, three-storey or tall terrace, large or shared stack | £3,000 – £6,000 |
| Chimney scaffold, two-storey house | £800 – £1,500 (up to about £2,500 for difficult access) |
| Chimney breast removal, ground floor only, with support above | £1,500 – £3,000 |
| Structural engineer's calculations | from about £300, commonly £300 – £600 |
Typical guide prices from published 2026 cost guides, not quotes.
Two typical Brighton jobs
A Hanover terrace with a shared stack. The scaffold stands on a steep, narrow pavement, so it needs a council highway licence and often a parking bay suspension, which needs seven working days' notice. If both neighbours take the whole stack down together, a total around £3,000 to £3,500 split between two households is realistic. Removing one half alone usually costs each owner more.
A 1930s semi in Patcham. The scaffold can usually stand on the drive, so there is no pavement licence. Expect roughly £2,200 to £3,000, with matching clay tiles the main variable. These are illustrative figures built from the guide ranges, not quotes.
If chimney breasts are coming out too, Brighton & Hove City Council's published Building Control fee for a chimney breast removal building notice is £269.50 including VAT. Check the council's current fee table before you apply.
The stack removal cost guide breaks the price down further, or ask for a quote on your own house.
Sources and further reading
- Brighton & Hove City Council: conservation areas
- Brighton & Hove City Council: Article 4 directions
- Brighton & Hove City Council: Article 4 direction, North Laine
- Brighton & Hove City Council: Article 4 direction, West Hill
- Brighton & Hove City Council: Article 4 direction, Brunswick comprehensive
- Brighton & Hove City Council: Round Hill conservation area appraisal
- Brighton & Hove City Council: highway licensing for skips and scaffolds
- Brighton & Hove City Council: scaffolding licence conditions
- Brighton & Hove City Council: choose the right Building Regulations application
- The Regency Town House: flint and bungaroush
- The Regency Town House: external and party walls
- Wikipedia: Bungaroosh
- Wikipedia: Kemp Town
- Wikipedia: Hanover, Brighton
- Wikipedia: Patcham
- Wikipedia: Saltdean
- GOV.UK: Party Wall etc. Act 1996 guidance
